From design to commissioning, we implement engineering solutions of any complexity for energy facilities.
HOME-AREAS OF WORK - ENGINEERING
We provide a full range of engineering services for energy facilities of any complexity. Our expertise covers all stages: from technical design and manufacturing of equipment to commissioning, staff training and subsequent technical support.
Our solutions are based on modern engineering approaches, deep industry expertise and many years of practical experience. We work in close cooperation with the world's leading manufacturers of power equipment, as well as engage specialised research and design institutes.
This allows us not only to execute projects, but also to create efficient, reliable and durable solutions that meet high international standards.
By choosing us, you get a partner, not a contractor
20+ years of experience in the energy sector
Cooperation with manufacturing plants
Full cycle of energy solutions
Technical engineering
Our specialists have more than 20 years of experience in performing specialised work both in Ukraine and at energy infrastructure facilities abroad: in countries near and far abroad, including Africa, Asia and Cuba.
Our specialists, together with manufacturers, are ready to develop a feasibility study, as well as design and supply a part of the plants.
We provide a full range of services for the design, installation and modernisation of turbines and units ranging from 2 to 500 MW. Our key projects include the modernisation of a steam turbine at Burshtynska TPP (200 MW).
We specialise in complex solutions in the field of engineering design, supply and installation of high-tech power equipment for thermal and gas power plants.
By choosing us, you get a partner, not a contractor
20+ years of experience in the energy sector
Cooperation with manufacturing plants
Full cycle of energy solutions
Technical engineering
Our specialists have more than 20 years of experience in performing specialised work both in Ukraine and at energy infrastructure facilities abroad: in countries near and far abroad, including Africa, Asia and Cuba.
Our specialists, together with manufacturers, are ready to develop a feasibility study, as well as design and supply a part of the plants.
We provide a full range of services for the design, installation and modernisation of turbines and units ranging from 2 to 500 MW. Our key projects include the modernisation of a steam turbine at Burshtynska TPP (200 MW).
We specialise in complex solutions in the field of engineering design, supply and installation of high-tech power equipment for thermal and gas power plants.
Our company implements turnkey projects tailored to the specific needs of our clients.
The scope of work includes:01. Development of detailed technological schemes for the implementation of power equipment.02. Thermal engineering calculations of operating modes of boilers and steam turbines.03. Selection of the optimal set of equipment in accordance with the specified parameters.04. Preparation of explanatory notes for efficient operation and maintenance.
01
Analysis of the task and customer requirements
02
Development of feasibility studies in cooperation with manufacturers
03
Design of technological schemes
04
Supply of equipment
05
Commissioning, training, technical support
Services
Menu
Created by
All rights Reserved
Services
Menu
Created by
All rights Reserved